Click to Home

Go To Search
RSSEmailPrint
Emergency Alerts
Greenridge
Greenridge treatment facilityLocation
The Greenridge wastewater treatment facility is located southwest of the intersection of Greenridge Road and Dan Drive.

Operations
The Greenridge wastewater treatment facility began operating in 2005 and can treat 15,125 gallons of wastewater per day. The facility provides services to 61 homes located in the Greenridge and Stonehedge residential developments. Wastewater is collected by a gravity sewer system, conveyed to two pump stations, and treated by an aerated lagoon.

Disposal MethodsMap of Greenridge treatment facility
Disposal of effluent, the outflow from the sewage treatment facility, is handled through drip irrigation on one field.

Map
Select the image at right to view a larger map of the Greenridge treatment facility and associated residential developments.

Home Contact Us Conditions of Use Privacy Statement Accessibility Copyright Notice Powered by CivicPlus
Upper Uwchlan Township | 140 Pottstown Pike, Chester Springs, PA 19425 | Ph: (610) 458-9400 | Fx: (610) 458-0307
Administration Office Hours: Monday – Friday 8:00 AM – 5:00 PM